NukeWatch Lawsuit Settlement Speeds Up Cleanup at Los Alamos Lab

FOR IMMEDIATE RELEASE, March 23, 2022
Contact: Scott Kovac, Nuclear Watch NM, 505.989.7342, scott@nukewatch.org 
Jay Coghlan, Nuclear Watch NM, 505.989.7342, jay@nukewatch.org

Today, Nuclear Watch New Mexico is announcing successful settlement of a lawsuit it brought against the Department of Energy (DOE) over its slow cleanup of the Los Alamos National Laboratory (LANL). The watchdogs’ lawsuit alleged violations of a 2005 Consent Order, which was a site-wide cleanup agreement between the New Mexico Environment Department (NMED) and DOE to address radioactive and toxic wastes at the Lab. NMED has since sued DOE to terminate a revised 2016 Consent Order issued under the Martinez Administration that is far weaker than the original 2005 Order.

After a six-year court battle, NukeWatch’s settlement agreement requires DOE to: 

1.   Reestablish a surface water flow monitoring station near where the Los Alamos Canyon meets the Rio Grande. This is critical because the Canyon has long been a known pathway for plutonium contaminants to migrate as far as 20 miles south to Cochiti Lake, a popular recreational area. The Buckman Direct Diversion Project (BDDP), three miles south of the Canyon, supplies drinking water directly out of the river to the City and County of Santa Fe. The original monitoring station warned the BDDP to close its intake gates as a precaution during stormwater events and allowed characterization of the radioactive contaminants in the stormwater flows. However, it was destroyed during a 2013 flood and DOE had refused to reinstall it ever since, despite repeated BDDP requests. Meanwhile, during that same period of time, funding doubled for LANL’s nuclear weapons research and production programs that caused the radioactive and toxic pollution to begin with. 

2.   Begin treating 158 corrugated metal culverts containing cemented radioactive liquid waste buried in Area G, the Lab’s largest waste dump. These large pipes need to be sheared down in size for shipment to the Waste Isolation Pilot Plant (WIPP) in southern New Mexico. The settlement agreement requires that size-reduction and packaging for shipment be completed no later than March 30, 2024. This, in turn, will help to accelerate final cleanup of Area G. 

3.   Investigate, characterize and, if necessary, clean up a total of 290 specific contaminant sites listed in the settlement. These 290 sites are almost 40% of the approximately 780 areas remaining at LANL that still need investigation and possible remediation. DOE shall conduct these investigations and initiate any necessary remediation of these 290 sites no later than October 1, 2024. NukeWatch will remain involved in that process to help ensure that appropriate cleanup is completed.

4.   Perform a feasibility study of comprehensive cleanup at one of the major waste pits at Area G. This will include feasibility analyses of radioactive and toxic wastes characterization, retrieval and shipment of radioactive transuranic wastes to WIPP, and reburial of low-level radioactive wastes in a modern landfill with liners and a leachate collection system. DOE’s current plan for its so-called cleanup is to “cap and cover” Area G, leaving some 900,000 cubic yards of radioactive and toxic wastes permanently buried in unlined pits and trenches, a permanent threat to our shared regional groundwater aquifer. 

You can see the full press release here

 

One comment

  1. Bravo! Hurray for Nuclear Watch New Mexico!
    I’m sure that activists will have to monitor the lab’s compliance with this court settlement. They just seem to need so much encouragement to do the right things…

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s